BazaarSpot

PRODUCTION OPERATIONS: Well Completions, Workover, and Stimulation

EGP 720
No ratings
production-operations-well-completions-workover-and-stimulation-2-940_9265a6db-f33e-44c3-afe9-cae496c0aeb4

Sold by

Description

Production Operations: Well Completions, Workover, and Stimulation is a two-volume set by Thomas O. Allen and Alan P. Roberts, published in 1978. It's a foundational technical manual for professionals and students in the oil and gas industry.

 

Summary

 

The two volumes serve as a comprehensive guide to the engineering practices involved in the production phase of an oil or gas well. They cover the essential processes required to bring a well online and maintain its productivity over time.

  • Well Completions: The procedures for making a well ready for production, including casing, cementing, and installing production tubing.

  • Workover: Operations performed on a well to maintain or increase its production.

  • Stimulation: Techniques used to enhance the flow of oil or gas, such as hydraulic fracturing and acidizing.

The book is notable for its practical, hands-on approach and has been a standard reference for many years in the petroleum engineering field.

 

About the Authors

 

  • Thomas O. Allen was a petroleum engineer and author. He worked extensively in the oil and gas industry, and his expertise in production operations formed the basis of this and other technical publications.

  • Alan P. Roberts was also a petroleum engineer and co-authored the book with Allen, contributing his experience and knowledge to create a comprehensive industry resource.

Price
EGP 720